KNOW WHAT GOES INTO A BATCH
Rock tumbler cost calculator
Allocate only what a batch consumes, then keep the machine and reusable tools in a separate equipment total.
VISITOR-ENTERED WORKSHEET
Plan one-time purchases and per-batch consumption separately
Leave an entire section blank if it does not apply. For each supply, enter the price paid for a known quantity and use the same unit for quantity priced and amount used—for example, ounces with ounces.
How the two calculations work
Electricity uses average watts × total running hours ÷ 1,000 to estimate kilowatt-hours. The worksheet multiplies that result by the electricity rate you enter. Include every planned stage and any repeat in total running hours.
Consumed-supply cost uses the price paid for a known quantity, multiplied by the amount assigned to this batch, then divided by the quantity priced. Keep both quantities in the same unit. If you used material from more than one package, combine the price and quantity first.
Why equipment stays separate
The recurring batch total contains only electricity and the portion of rough, abrasive, polish, media, or other supply allocated to this batch. The machine and reusable accessories appear separately because buying equipment once is different from consuming it in every run.
This worksheet does not calculate checkout cash for full supply packages. A package may cost more today than the portion assigned to one batch. It also does not spread equipment across an assumed number of future batches; that would require a visitor-chosen ownership scenario rather than a known operating cost.
Use evidence from your setup
Use a measured average or the exact machine’s documented power input, your own utility rate, and the quantities you actually plan to use. The result remains an estimate: operating time can change, a repeated stage adds cost, and a label rating may not equal average draw.
Read the running-cost method, document the source for an abrasive dose, or record the batch in your private studio.